Skip to content

Assessment Template

Page Summary

A fill-in record for assessing one agentic system under the ARC Framework. It follows the four steps of the developer guide and fixes the fields every assessment should capture — including the evidence behind each control and who accepts residual risk — so that assessments are comparable across systems and auditable later. Copy the Markdown, or reproduce the tables in your own tooling; ARCvisor exports the same structure.

0. System overview

Field Entry
System name and owner
Purpose and users
Deployment context (internal / external; pilot / production; jurisdiction; sector)
Agents and architecture (single agent / multi-agent; orchestration pattern; protocols such as MCP, A2A)
Autonomy: which actions run without a human in the loop
Register version assessed against e.g. 1.3.0 (see the changelog)
Organisation's relevance threshold e.g. Impact ≥ 3 AND Likelihood ≥ 3, OR Impact ≥ 4
Assessment date; assessor; reviewer

1. Capability inventory

Capabilities are system-level: if any agent has one, the system has it. Include read-only functions.

Capability Present? Which agent / tool provides it Human approval required before acting?
CAP-01 Planning and Goal Management
CAP-02 Agent Delegation
CAP-03 Tool Use
CAP-04 Multimodal Understanding and Generation
CAP-05 Official Communication
CAP-06 Business Transactions
CAP-07 Internet and Search Access
CAP-08 Computer Use
CAP-09 Other Programmatic Interfaces
CAP-10 Code Execution
CAP-11 File and Data Management
CAP-12 System Management

2. Applicable risks

List every applicable risk: all baseline risks (those arising only from components CMP-01 to CMP-04 and design elements DSN-01 to DSN-03 — 20 in register 1.3.0), each capability risk for a capability marked present, and each composite risk whose capabilities are all present. Score each; a risk is a priority when it meets the threshold. A risk below the threshold stays on the list — its Level 0 controls still apply.

Risk ID Statement Element(s) Contextualised description (how it would materialise here) Impact (1–5) Likelihood (1–5) Priority?
RISK-001 CMP-01
…

2a. Capability combinations

Some risks arise only when a system holds several capabilities at once (see Capability combinations). Record the check for each combination the register defines. Register 1.3.0 defines one, the lethal trifecta. Count what persistent memory holds when answering for each leg.

Combination Leg Supplied by (capability, or "none") Present in this system? (yes / no, with evidence)
Lethal trifecta Untrusted content
Sensitive data
Outbound channel
Field Entry
Verdict (present / possible / not present)
If every leg is present: which leg is removed or gated for each agent, and how (CTRL-0097)
If a leg is absent: which one, and the evidence (CTRL-0097 is then Waived — not applicable)

3. Controls

One row per control per risk, even where the same control addresses several risks. Every Level 0 control of every applicable risk is listed with status Implemented as-is, or Waived — not applicable where the capability or component it concerns is not present in the system, with evidence of its absence. Level 1 and 2 controls are listed for priority risks (and for any other risk where you choose to adopt them); if not adopted, record why.

Risk ID Control ID Level Status (as-is / adapted / not adopted / waived — not applicable) Implementation or adaptation (what, where, thresholds) Evidence (config, test result, log, review record) Owner Verified on
0 Implemented as-is
0 Waived — not applicable e.g. "The system uses no MCP servers" e.g. the tool registry listing every tool it can call
1 Adapted
2 Not adopted — rationale

Evidence

Evidence is what an auditor or a future maintainer can check without asking you: a configuration file or policy in version control, a test report, a screenshot of a guardrail setting, a log query that shows the control firing. "Implemented" without evidence is a claim, not a control.

4. Residual risks

For each priority risk, and for any Level 1/2 control not adopted, ask: what failure scenarios does the implemented set not prevent?

Risk ID Residual failure scenario Strategy (accept / monitor / mitigate) Concrete actions and measurable thresholds Residual Impact / Likelihood Accepted by (role)
e.g. "alert if > 10 injection attempts/day; quarterly red team"

Escalate to senior stakeholders any residual risk with Impact 5, any regulatory exposure, and any risk with no strategy.

5. Sign-off and review

Field Entry
Assessor (development team)
Reviewer (governance team)
Residual-risk acceptance authority name and role — this is the person accepting Section 4
Deployment decision approve / approve with conditions / defer
Conditions
Next review date or trigger e.g. quarterly; any new capability; register MINOR version change